INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete Pavement Joints

Concrete Pavement Joints

Concrete Pavement Joints

(OP)
Hello,

I am designing a running track as a volunteer for an elementary school. 1/8 mile oval track with a 12' wide concrete running surface (will be overlay with a poly surface down the line). The section for the track I used is a 4" thick concrete section with rebar. Would calling out construction joints every 5' and then expansion joints every 25' seem reasonable? The school is in Florida so just calling out 4" thick concrete section over compacted sand subgrade.

Any thoughts?

Thanks

RE: Concrete Pavement Joints

martin888888....be careful with specifying only 4 inches of concrete. Your subgrade will have to be extremely flat. The loading is irrelevant, but the constructability and shrinkage will control. I would also not reinforce the slab, unless you can carefully control the placement of the rebar.

Your joint pattern will lead to more cracks. For a 12' wide slab, I would place CONTROL joints (not construction joints) every 10 feet by sawcutting. The sawcuts must be done the same day as concrete placement, no matter how late that might make the finishers stay. You will only need an expansion joint about every 150 feet. Let your expansion joints also serve as construction joints.

Specify a flatness tolerance for the slab since you are using it as a running track. You do not want undulations in the concrete that will create high/low spots. Also specify a surface finish compatible with the expected surfacing to be applied, likely a light to medium broom finish.

Next, use the largest aggregate you can for the placement. Do not allow a pump mix if you can help it....for small projects such as this they will want to use a small pump which requires smaller aggregate, more cement and more water. Keep the water-cement ratio to no more than 0.55, preferably lower.

Don't compromise the concrete mix quality. Make sure they submit a mix design for approval prior to placement. Review it carefully for the properties noted. If you are in Central Florida, be careful of the aggregate source. If you get aggregate from the Brooksville area, it can have some reactivity which causes pop-outs. Doesn't happen all that often, but can and if it happens on your job, you'll regret it!

RE: Concrete Pavement Joints

For what it's worth, I've almost exclusively seen running tracks constructed on asphalt, not concrete.

RE: Concrete Pavement Joints

I would also want to know what the skink/swell properties of the soil are, as generally these running tracks need to be somewhat flat and controlling movement of clays can be an issue.

http://www.nceng.com.au/
"Programming today is a race between software engineers striving to build bigger and better idiot-proof programs, and the Universe trying to produce bigger and better idiots. So far, the Universe is winning."

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources