Fee schedule
Fee schedule
(OP)
I am trying to figure out if other engineers have some sort of a fee schedule for different tasks they perform. I usually charge the standard rate for design, inspections, shop drawing review etc. However, I am wondering if anyone charges different rates if you are asked to do other tasks such as emergency site visits (drop everything and come now) or for being an expert witness at a legal deposition?






RE: Fee schedule
I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.