INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

P&ID Symbol - Indentification help
2

P&ID Symbol - Indentification help

P&ID Symbol - Indentification help

(OP)
Hi all,

I was going through a P&ID today and I saw an unfamiliar symbol, I think it might be an hydraulic actuator, but I'm not to sure. It's a circle with a curly tail. I had a look through the ISO standards but nothing came up. Can someone please provide an answer. I've attached a picture.

Thank you.

RE: P&ID Symbol - Indentification help

Based on what your sketch shows I would guess it is a non-standard "Made-Up" symbol for that specific project.

You have some opinions:
A- All projects are supposed to have a P&ID Legend Sheet showing all symbols and their description. Have you looked for the Legend Sheet for your Project?
-
B- Have you met the Lead Process Engineer for your Project yet? Go find him or her and ask them what that symbol means. If they don't know you are in real trouble.
-
C- Use the Internet to find what you need by doing simple searches. Such as:
https://www.lucidchart.com/pages/p-id-symbols-lege...
or
https://www.google.com/search?q=p%26id+symbols&...

Sometimes its possible to do all the right things and still get bad results

RE: P&ID Symbol - Indentification help

(OP)
Thanks for replying pennpiper.
I did a web search and nothing came up. I also checked the legend but it wasn't on there either. I haven't spoken to the Lead Process Engineer, I'll do that first thing when I get into the office.

Thanks again.

RE: P&ID Symbol - Indentification help

Heliumballoon?

RE: P&ID Symbol - Indentification help

It would be good to see where it is used in a diagram but is it a hand held, but cable attached control unit? Like one you might use for a crane control? you would normally expect it to have a few notes attached to define it better.

Never seen anything like it before now.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: P&ID Symbol - Indentification help

Typically, the "curlie-cue" symbol I see (attached to the "Circle-H" symbol) is a note to the drafter to remove that item. It may be that an engineer meant to indicate in the drawing for that item to be removed and it accidentally just got retained. This is just editorial convention though when marking up P&IDs for drafting in my experience.

RE: P&ID Symbol - Indentification help

Hydrogen sperm!

In all seriousness though, adammal44's suggestion seems very plausible. And as pennpiper said, ask the process engineer. I've also had luck once in a while asking the CAD guys who actually modify the PIDs all day long, they usually have a decent handle on what everything represents.

RE: P&ID Symbol - Indentification help

Typically, the "curlie-cue" symbol I see is a note to the drafter to remove that item.

I admit to never seeing that convention having viewed thousands of P&ID markups from dozens of companies.

Piping Design Central

RE: P&ID Symbol - Indentification help

The symbol is from copy editing.

RE: P&ID Symbol - Indentification help

Duwe6, are you implying that "copy editing" symbology (traditionally understood as belonging to commenting on text-based information transmission in storytelling and narratives) is now being used on P&IDs by people with authority to make changes?

I think I might see the problem...

Piping Design Central

RE: P&ID Symbol - Indentification help

It's a clear, proven shorthand method to indicate changes to a document. Shouldn't be that shocking.

RE: P&ID Symbol - Indentification help

(OP)
I've asked the originator of the drawing, he was on holiday so I've had to wait a few days until his return. It turns out it is an hydraulic actuator that's mounted on a valve, but the symbol was created because there wasn't one with the drawing template or in the symbols library. I've had the drawing updated with a correct symbol and the legend now identifies the symbol correctly. It turns out that I wasn't the first to ask the originator what the symbol was, but it seems that a most people just ignored it.

Thank you to everyone who replied to my question.

RE: P&ID Symbol - Indentification help

Thanks for the follow-up, Muon, to close the loop on this thread.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources