INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

what is an accepted measurement uncertainty in natural gas distribution system quantity metering

what is an accepted measurement uncertainty in natural gas distribution system quantity metering

what is an accepted measurement uncertainty in natural gas distribution system quantity metering

(OP)
Hello,
I am looking for publications and/or private experience and/or examples and/or calculation programs
Thanks.
Ehud

RE: what is an accepted measurement uncertainty in natural gas distribution system quantity metering

Ehud,

Measurement uncertainty is normally defined in the delivery/sales gas contracts. Suitable metering systems are chosen accordingly.

Dejan IVANOVIC
Process Engineer, MSChE

RE: what is an accepted measurement uncertainty in natural gas distribution system quantity metering

In really large scale systems I've seen required "accuracy" or rather "uncertainty" be listed as no more than 1.1% of energy. The calculation comes from something like AGA 8 to handle all the pressure and temperature compensations and adjustments, never mid the accuracy and repeatability of the relevant instruments.

"Domestic, very low pressure distribution on the other hand.

The UK gas meter regulations from the 1980's state that it should not differ by more than 2% of volume.

The latest European spec divides things into an upper and lower band for flow and different turndown factors. The Maximum Permitted Error (MPE) is either 2% (low flow band) or 1% (higher flow band) for a meter with a turndown of 1:20. for meters with bigger turndowns it is 3% or 1.5%. If errors are all on one side of measurement (same sign) from base then they should not exceed 1% or 0.5% respectively.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources