Built up welding on high pressure boiler pressure parts
Built up welding on high pressure boiler pressure parts
(OP)
Dear experts,
Is any ASME code permitting built up weld repair on high pressure running boiler pressure parts instead replacing with inkind tube piece?
Thanks in advance
Is any ASME code permitting built up weld repair on high pressure running boiler pressure parts instead replacing with inkind tube piece?
Thanks in advance





RE: Built up welding on high pressure boiler pressure parts
Even if they do, it's one that really needs to be approached cautiously. Especially for high temperature or pressure services.
RE: Built up welding on high pressure boiler pressure parts
RE: Built up welding on high pressure boiler pressure parts
And if you are where I suspect you are, hire [or 'grow'] an API-510 Inspector. Valid repairs make sense. PCC-2 will show you how to design and make valid repairs.
RE: Built up welding on high pressure boiler pressure parts
RE: Built up welding on high pressure boiler pressure parts
sometimes Repair costs more than replace
RE: Built up welding on high pressure boiler pressure parts