INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

All-welded moment connection
2

All-welded moment connection

All-welded moment connection

(OP)
I designed a cantilever beam with a moment connection to a column web using a web plate for shear and bolted flange plates for the moment. However, the contractor just welded around the beam end to the column - no web plate, no flange plates, no bolts! I now need to check this to ensure that the connection is adequate. Can anyone direct me to an all-welded moment connection design or example? I know that I came across an example a few years ago but I cannot remember the reference. Any help or guidance would be appreciated. Thanks!

RE: All-welded moment connection

It's not too crazy to have an all-welded moment connection using fillet welds and/or groove welds, usually works fine from what I've found. The reason it's not done is it's very hard to ensure beam is level and correctly positioned and the correct length. In addition, the overhead welds that are typically involved are difficult.

However, they changed your connection detail and now you have to perform additional work to prove and verify their connection works. Charge them a change order to review it or have them rip it out.

Professional and Structural Engineer (ME, NH)
American Concrete Industries
www.americanconcrete.com

RE: All-welded moment connection

I dislike the connection for two reasons:

1) You'll have to do some fancy yield line analysis on the web to assess the strength.
2) Assessing web flexibility, and there for cantilever deflection, will be tough.

This won't really answer your question but might provide some useful ideas: Link

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: All-welded moment connection

KootK is correct, I might have made this sound simpler than it is. Depending on how this was welded, the thickness of the webs, what part of the column it's welded to, and how the beams are loaded; you may have additional issues.

Professional and Structural Engineer (ME, NH)
American Concrete Industries
www.americanconcrete.com

RE: All-welded moment connection

If it is a full-pen weld that was properly beveled, you do not even need to check it, as it exceeds the strength of the member.

However your statement that they welded all around sounds like a fillet weld, in which you would need to do some analysis. If they didn't RFI and get this change in writing, I am in agreement with TehMightEngineer. Need to back-charge them for the extra work.

RE: All-welded moment connection

andriver,
That might be true for the weld, but as others have indicated, the weak link is likely the column web.

RE: All-welded moment connection

I missed that bit

RE: All-welded moment connection

If you spec'd AISC and AWS, look up AWS welding requirements, including required WPS etc. Did they submit all of this or have it on record?

RE: All-welded moment connection

(OP)
Thanks everyone for the responses and advice. It sounds like I really do have a lot of work to do. I was sure it was just a matter of a quick calculation to design/check the welded connection for the moment. I think AISC has an example of that but I cannot remember where.

Buggar, nothing was submitted. I visited the site and noticed that they installed the beam differently from what was on the drawings.

RE: All-welded moment connection

2
If it were me, I'd have a flange plate installed top and bottom that connects the flanges of the beam to the flanges of the column. Unless there are fifty of these or some other special circumstance, the four billable hours that you'll spend trying to evaluate this will be worth more than the fix.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: All-welded moment connection

(OP)
Andriver, you are right. It is a fillet weld all around the beam onto the column web.

KootK, that's what I eventually did....had them install the plates.

Thanks All!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources