Costs Associated with Reviewing/Signing Sealing Pre-Fabricated Truss Designs
Costs Associated with Reviewing/Signing Sealing Pre-Fabricated Truss Designs
(OP)
I believe it is pretty common in the prefabricated truss industries that some plants have a truss design staff but do not staff registered professional engineers. I was curious if anyone in the industry or anyone knew of some reference material on the costs associated with subcontracting out the signing and sealing of their truss designs to a registered professional engineer.