Valves API 6A at level PSL 4 and 10000 psi
Valves API 6A at level PSL 4 and 10000 psi
(OP)
Dear All,
Good day, I'm working in a company of valves and we are starting for to obtain API spec. 6A and API spec. Q1 at level PSL 4.
My question is: make a valve prototype with rating pressure 10000 psi, test level PR 2 and others mandatory requirements for to obtain PSL 4 certification, it’s not allowed to produce and sell valves monogrammed API 6A with higher rating pressure at 15000 or 20000 psi?
Thank you All
Good day, I'm working in a company of valves and we are starting for to obtain API spec. 6A and API spec. Q1 at level PSL 4.
My question is: make a valve prototype with rating pressure 10000 psi, test level PR 2 and others mandatory requirements for to obtain PSL 4 certification, it’s not allowed to produce and sell valves monogrammed API 6A with higher rating pressure at 15000 or 20000 psi?
Thank you All





RE: Valves API 6A at level PSL 4 and 10000 psi
RE: Valves API 6A at level PSL 4 and 10000 psi
So, getting started, is adequate to design a small flanged valves e.g. size 2 1/16 in, 2000 psi and performance requirement level PR1? This valve can be proposal to consultants API for a license PSL 4?
RE: Valves API 6A at level PSL 4 and 10000 psi
In my perspective,
given the company has API 6A & monogram license, the company can create valve prototype 10,000PSI PSL4 and qualify it to PR2 once it passed the test.
but it doesn't mean that prototype can qualify the higher rating pressure like 15k & 20k. you can read API 6A (20th ed.) Annex F.1.14 for scaling rule.
Even if I put some perspective from customer side, how can the valve manufacturer can qualify their product for 15k & 20k
given they only have test data up to 10k.
RE: Valves API 6A at level PSL 4 and 10000 psi
For the OP's reply, you would need to have the quality documentation, and procedures in place to manufacture to PSL4, and apply for it on your license. The maximum PSL rating you are allowed to monogram will be listed on your license. I'm not positive on the following point, but it is my understanding that you have to have manufactured at least one item of each category listed on your license. That may include manufacturing to the maximum PSL rating.