INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Shear plane reinforcing

Shear plane reinforcing

Shear plane reinforcing

(OP)
I have inherited a project that has issues. There are embed plates supporting beams that do not meet ACI Apendix D requirements. An idea that has been presented that involves crossing the possible shear failure planes with new rebar epoxied into the wall and welded to a plate to develop the rebar strength on either side of the possible shear planes.

I have not used this approach before. ACI gives examples of providing reinforcing when it is parallel to the force and within a distance from the anchor which I have used many times before. In this case the new reinforcing for the existing plate and studs will be perpendicular to the shear force. My concern is the theoretical shear planes may not be the actual shear plane and the new reinforcing I am showing may not be located where it will be required, and will therefore not intersect the plane as needed to develop the yield strength of the bars on either side of the plane.

The idea is to keep the shear plane intact thru shear friction using new epoxied rebar. I have attached a sketch of the concept. Anyone done this before?

RE: Shear plane reinforcing

I can't say that I fully understand the proposed concept but I'm pretty skeptical none the less. What are the critical failure modes in the original embed that need to be addressed? In my estimation, shear breakout wouldn't be improved at all and shear pry out would be improved only very modestly.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Shear plane reinforcing

Analytically, it might be simpler to just post install a new plate over the old and work with that. At least you can make use of established procedures that way.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Shear plane reinforcing

(OP)
Shear breakout controls in the original. Looking at the section, it looks like the breakout could push the rebar over into bending and not develop any shear friction.

RE: Shear plane reinforcing

For the shear breakout mode, it doesn't appear that the proposed anchors would alter the shape of the breakout surface much at all. Maybe a row of anchors 6" above the plate, and possibly out past the sides, would be more convincing.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources