INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Redesign of existing 12F tank to comply with API 650
2

Redesign of existing 12F tank to comply with API 650

Redesign of existing 12F tank to comply with API 650

(OP)
Hello,

I have been asked to look into whether or not it is possible to redesign/re-certify existing storage tanks that were designed and constructed to API 12F to be compliant with API 650.

My initial feeling is that this will not be possible due to the more stringent examination requirements of API 650. I think that it also likely that additional venting will need to be installed on the tanks.

It appears that the province of Alberta dealt with this issue a few years ago - http://ptmaa.ab.ca/index.php/api12f-tanks

If anyone has any experience with this issue I would really appreciate hearing about it.

Thanks.

RE: Redesign of existing 12F tank to comply with API 650

Generally not.
One issue is the various paperwork/inspection requirements. There's no way to look at an existing weld and say it was done in accordance with the standard. Ditto for the materials meeting API-650 requirements.
Also check top angle details and bottom chime details for compliance.
Also check roof slope for compliance.

RE: Redesign of existing 12F tank to comply with API 650

I agree with JStephen that this, if possible, will not be economical.

In addition to the previous items, for 12F to API 650 you will require:
- Radiography of joints
- Hydrostatic test of tank
- Addition of anchorage for wind and/or pressure
- If no foundation is present, anchoring scheme to ground
- Addition of emergency venting apparatus
- Tank grounding, if not already present
- Evaluation of design metal temperature (if below -20°F)
- Removal of square flush cleanout (not permitted by API 650)
- Evaluation of external projection of nozzles

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources