×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

sulfuric acid heat exchanger- retubing operation

sulfuric acid heat exchanger- retubing operation

sulfuric acid heat exchanger- retubing operation

(OP)
hi members,

currently we perform the retubing operation of one of the sulfuric acid coolers (fluid circulation pattern: CO-CURRENT, brend: CHEMETICS, schell side: SULFURIC ACID 107°C/77°C, pressure drop: 1.04 KG/CM3, material grade: 304L, tube side: SEA WATER 31°C/41°C, pressure drop: 0.63 KG/CM3, material grade: 904L)and it's been a period of time we hesitate about wich combination of works for tube to tube sheet joint (welding, expanding, seal or strength types). any help? some photos of the operation's start are given here attached.

Thanks and regards

RE: sulfuric acid heat exchanger- retubing operation

Are you changing the materials of construction?
These acid coolers are very specialized. I would never undertake rebuild of one.
Go back and buy a replacement from the original manufacturer.
A very small mistake will result in a life measured in days, if not hours.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: sulfuric acid heat exchanger- retubing operation

(OP)
hi Edstainless,

we do not change any construction material, although we only have purchased a new amount of tubes exactly as the old ones wich are of UNS A 249 grade.

RE: sulfuric acid heat exchanger- retubing operation

Use the original code of construction method for joining the tubes to the tubesheet, if this is an in-kind re-tube.

RE: sulfuric acid heat exchanger- retubing operation

It just seams odd that you would risk 304 in sea water service.
I am guessing that the original design was NOT intended to be seawater cooled.
These tubes are frequently welded flush with the inside face of the tube sheet so that there are no crevices on either side.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: sulfuric acid heat exchanger- retubing operation

Why do not you buy a new bundle or even a new heat exchanger? From your picture,the parts you can probably re-use might be only the tube sheets. I can provide you a new unit at lower cost than your repair cost.

RE: sulfuric acid heat exchanger- retubing operation

(OP)
cmsvessel

some reasons we are proceeding this way are:
-the period of time it tooks to manufacture a new cooler is almost one year
-the new tubes are new provisions of us
-the whole first shell parts are to be reused
-the old tubesheets are not to be reused but other machined new ones are to use
-the cost of this complete operation is about one fourth the cost of a new cooler

so, why not to proceed in this way in your opinion?
what are you suggesting as a low cost to perform this operation with or even to built new other one?

thnxxx

RE: sulfuric acid heat exchanger- retubing operation

Just one quick question, does this exchanger use anodic protection?

RE: sulfuric acid heat exchanger- retubing operation

Yes, it uses a lot of CP.
With this material of construction it is the only way that it would survive.
That is usually how these fail, failure of the CP. (or they run the acid too hot, or too dilute, or they pick up some Cl contamination, or about 12 other things)


mjellali,
Are you sure that your replacement materials meet all of the original requirements? (composition, manufacturing methods, NDT methods)
The tube-tubesheet welds are critical, as is the CP system.
I can see you building 4 of these and still not getting it right.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources