INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

API 650 Design Criteria for a 10'x8' Access Hatch

API 650 Design Criteria for a 10'x8' Access Hatch

API 650 Design Criteria for a 10'x8' Access Hatch

(OP)
Can someone direct me to the API 650 design criteria for a 10'x8' hatch? The largest opening detailed in section 5.7 is 48"x48". A customer is looking for a reusable cleaning access, but I have never come across something of this size. Any help would be greatly appreciated.

RE: API 650 Design Criteria for a 10'x8' Access Hatch

How often is your client planning to use the "hatch"?

Usually when these tanks are repaired, the section is cut out for access and then replaced when the work is complete.

RE: API 650 Design Criteria for a 10'x8' Access Hatch

(OP)
The scope of work calls for exactly the operation you mentioned, but they requested cost for the option of "installing a removable door panel for future cleaning of the tank." We have removed and replaced sections many time before, but I have never made an access panel to be reused.

RE: API 650 Design Criteria for a 10'x8' Access Hatch

There's not any API-650 design criteria for such a hatch; it does not meet the API-650 standard.

They probably need to invest their money in smaller equipment rather than bigger hatches.

RE: API 650 Design Criteria for a 10'x8' Access Hatch

(OP)
That's what I thought, but I want to make sure I didn't miss something.

Thank you for the informative and quick responses!

RE: API 650 Design Criteria for a 10'x8' Access Hatch

What is your clients purpose for such a large cleanout? A 48" x 48" cleanout should be more than enough, and as stated before, anything larger than that does not meet API 650 std, section 5.7.7.1.

RE: API 650 Design Criteria for a 10'x8' Access Hatch

(OP)
The primary purpose is to accommodate excavators and other equipment involved in the removal of the concrete floor. Other work such a drive replacement and rake servicing will make use of the access.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources