INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bolted Wide Flange Splice Connection Details

Bolted Wide Flange Splice Connection Details

Bolted Wide Flange Splice Connection Details

(OP)


Many structural engineers I talked to are only familiar with welded wide flange splice connections. They almost never did bolted connections on the splice. So I'd like to hear from those who have worked on this.

This is the wide flange sample (w8x21) to be spliced.. it has 10mm top and down flange thickness.



1. When using bolted splice.. does the cover plates have to be as thick as the flange (10mm)?

2. Have you used 2 bolts per side only (it's 3 bolts per side in the picture shared by Kootk). The head engineer computed even one bolt (12mm bolt) is enough to hold the weight.. but for moment connection.. is 2 bolts the minimum or 3?

3. How long must the cover plates extend to each side? How is this computed?

4. Is there a counterpart of American Welding Society such as Bolted Welding Society and guidelines for it like the AWS D1.1?

5. Please show how you did your wide flange splice connection.. also pictures appreciated..

6. We will let 3 separate structural engineers design it locally but since they never worked on it. We need some idea for comparison.. many thanks!

RE: Bolted Wide Flange Splice Connection Details

Quote (sedonas)

1. When using bolted splice.. does the cover plates have to be as thick as the flange (10mm)?
2. Have you used 2 bolts per side only (it's 3 bolts per side in the picture shared by Kootk). The head engineer computed even one bolt (12mm bolt) is enough to hold the weight.. but for moment connection.. is 2 bolts the minimum or 3?
3. How long must the cover plates extend to each side? How is this computed?
4. Is there a counterpart of American Welding Society such as Bolted Welding Society and guidelines for it like the AWS D1.1?
5. Please show how you did your wide flange splice connection.. also pictures appreciated..
6. We will let 3 separate structural engineers design it locally but since they never worked on it. We need some idea for comparison.. many thanks!
1. If you are expecting to develop the full WF section in bending, the cover plates must have the same area as the flanges, not necessarily the same thickness.
2. Two bolts are permissible if they are adequate to do the job.
3. Simply observe normal bolt spacing and end distances.
4. I don't know.
5. No pics available, sorry. But there are some on the internet.

You may find some useful information here:
http://www.cisc-icca.ca/files/publications/techpub...



BA

RE: Bolted Wide Flange Splice Connection Details

Consider using the AISC Steel Construction manual as a reference for designing your connection.

Best regards - Al

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources