INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cut out of welding due to Repair

Cut out of welding due to Repair

Cut out of welding due to Repair

(OP)
Hi Dear Friends
It is mentioned in our welding Specification that after for Example 2 time repair of Piping, New Defect shall be removed by Cut out; this removal shall include HAZ removal. HAZ per some handbook is 2 mm and macroethced of WPQR samples shows discolored part of base metal is between 1 to 4mm based on thickness of material. When Cut out shall be done if you remove HAZ(2-3mm of each side of weld metal) from base metal then your gap will be about 10 mm which is not so practical because of fixed length of Spools, so for my question consider a joint between a pipe and elbow in a fixed line;
What do you do in reality in your company?
a. Do you Cut and expel elbow with additional length of pipe from both side of elbow and replace it with new elbow and pipe pieces; what about cost of these new material?
b. If you cut only the weld; isn’t this type of cut out more harmful than conventional repair?

thanks for sharing your knowledge and experience

RE: Cut out of welding due to Repair

pedro84,
You cut out the weld and install a "pup piece".
The length of this pup piece will be governed by your specification (proximity of circ welds)- not by any code.
If it is not noted in the specifications the length should be approved by the relevant piping engineers.
It is called CYA,
Cheers,
DD

RE: Cut out of welding due to Repair

(OP)
Dear DekDee

thanks for your post; Can you please write what CYA stands for? or make a reference to what you declared above.

Thanks

RE: Cut out of welding due to Repair

pedro84,
CYA means "Cover your ass".
What it means is do not try to make a decision on your own based on what you are told on an internet forum.
Send your questions to the people who are responsible for designing the piping system - the piping engineers.
Cheers,
DD

RE: Cut out of welding due to Repair

(OP)
Hi
I found something reliable in total specification for this type of repair:

"For 3 ½ Ni materials, as well as for austeno-ferritic duplex stainless steels, a second repair of
the same area on a given weld shall not be permitted: should a defect be repaired on a
previously repaired weld area, the whole weld shall be cut and rewelded after having restaured
the base materials to their initial condition (i.e. remove heat affected zones, damaged surfaces,
etc.). "

Bye.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources