INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HRSG seismic loads

HRSG seismic loads

HRSG seismic loads

(OP)
I am involved in calculations of a HRSG boiler 32 m. height, 6 m. length and 3,6 m. width, horizontal tubes bundles, vertical gas flow (european type), inlet gas temperature 650ºC (1200 ºF). The tube bundles rest on two vertical perforated plates which are suspended by lugs with pins from the next upper bundle and finally all the weight goes to the top steel by rods. Casing is internal insulated and also suspended by rods from the top steel. Seismic coefficient is 0.3g. My question is:
All analogies that I have seen show no connection between bundles and casing then, how seismic horizontal forces are transferred from the hanging tube bundles to the seismic bumper ties of the casing? Anybody knows?
Thanks in advance.

Bartholomew

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources