INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NDT Requirement

NDT Requirement

NDT Requirement

(OP)
HI ....
What type of NDT that you prefer for the butt welded cap with the vent connection.Normally i had seen the cap as threaded and we are preferring DPT for the seal weld.But here we have the doubt that 100% RT /UT is required?

RE: NDT Requirement

What Code applies to this system?
What fluid pressure, temperature, and service?

If a threaded fitting were used before (to the vent ? Or to the relief valve inlet?) and a seal weld, why was the seal weld used? (Was it on the pressurized side of the vent ?)

Why do you think a 100& UT and RT is required?

RE: NDT Requirement

(OP)
Code which prefer is B31.3 and Exactly i dont have the Temp and pressure value.Just confirmed that high pressure service and material is ASTM A 403 Gr.WP304/304L.And with respect to the design, Even it is normal service also ,vent cap are seal welded.Technically i dnt hav much idea regarding the requirement of seal weld or butt weld in vent closure. Hope some one can explain the same and As per B 31.3,

345.2.3 Special Provisions for Testing

(c) Closure Welds. The final weld connecting piping
systems or components which have been successfully
tested in accordance with para. 345 need not be leak
tested provided the weld is examined in-process in
accordance with para. 344.7 and passes with 100% radiographic
examination in accordance with para. 344.5 or
100% ultrasonic examination in accordance with
para. 344.6.

RE: NDT Requirement

ssreekylm,
A butt welded cap onto a vent line is no different to any other joint in the system.
If you are required to do 100% RT/UT then this will most definitely include your joint."
Not sure why you have posted an excerpt from the code detailing closure welds - your situation is not a closure weld,
Cheers,
DD

RE: NDT Requirement

(OP)
DekDee,
I agreed with you that normally it is not a closure weld.But,due to the reason of this joint design is groove and It will be welded after hydro test its comes under the closure weld category or not?

RE: NDT Requirement

Not

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources