INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Air Handler Energy Consumption with Building Automation System Data (air side)

Air Handler Energy Consumption with Building Automation System Data (air side)

Air Handler Energy Consumption with Building Automation System Data (air side)

(OP)
Hi,

I am a researcher in civil engineering. I am a newbie in thermodynamics and want to figure out if it's practical to use Building Automation System data to calculate the energy consumption of Air Handler Unit.

I don't have continuous measurement of the heating/cooling coil water temperature and flowrate, so I want to use air temperature difference, duct air flowrate, and other available datapoint inside the AHU, mostly, at the air side (e.g. inlet air temperature, discharge air temperature, air flow rate), to evaluate the thermal energy consumption based on the principle: the thermal energy gain/lose of the heating/cooling coil water = thermal energy gain/lose of the air passing through the coils.

I would like to ask for help to confirm if this is a reasonable way to estimate the thermal energy consumption of the AHU. Are there other parameters I must consider? e.g. pressure rise in the duct (now I only have static pressure data at the discharge air side, that static pressure is about 1-2 inch w.c.), relative humidity (related to latent heat)? Are there other important factors I haven't realized?

Thanks in advance for the help!

Jerry

RE: Air Handler Energy Consumption with Building Automation System Data (air side)

It can be done. However, you need to hire a mechanical/HVAC engineer as he/she will have the tools and expertize to do this.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.