INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ACI 318 / PCI Base plate with through bolts

ACI 318 / PCI Base plate with through bolts

RE: ACI 318 / PCI Base plate with through bolts

Reference... I wish. Nobody ever seems to want to commit to a through bolt connection procedure nowadays. I`ll share what I know/think:

1) I'd treat it as an an eccentric punching shear problem with the lower plate defining the origin of the critical shear perimeter. Moment = Shear x 0.5 x slab depth.

2) I'll prestress the bolts so that I can transfer shear to the concrete via shear friction at the base plate interface. Trouble is, prestressing short bolts reliably is tough. And they tend to relax over time as a result of concrete creep etc.

3) In addition to shear friction, I'll check the bolts for bearing against the concrete assuming that the bolts bear uniformly over a distance of six times the bolt diameter. This is just something that somebody told me to do once and I don't have a whole lot of faith in it.

4) If you're near a free edge in the direction of shear, you'll need to approximate a breakout failure check similar to what we do with ACI appD checks.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: ACI 318 / PCI Base plate with through bolts

not sure how I would handle the shear transfer...it obviously transmits a moment into the concrete....would be hesitant in using it for any sizable shear transfer....as Koot pointed out, what would be the assumed effective length of uniform bolt bearing on the concrete...

RE: ACI 318 / PCI Base plate with through bolts

Without being covered by Appendix D, I don't know where to begin.

RE: ACI 318 / PCI Base plate with through bolts

As to vertical load, it is just like any point load on a concrete slab, except you have to check it both up and down. For shear, the bolts could take load in shear in much the same fashion as any post-installed bolt, say adhesive ones. If that is not enough, you have a problem. References (including Appendix D), you don't need, just analytical thinking.

RE: ACI 318 / PCI Base plate with through bolts

@Hokie: I'm curious about your "like any other PI bolt" comment. I've been asssuming holes slightly larger than bolts. Would that change anything for you?

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: ACI 318 / PCI Base plate with through bolts

Yes, I would want a tight fit. Either drilled the same size and driven in or set in epoxy.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources