INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NOT permitted materials

NOT permitted materials

NOT permitted materials

(OP)
can materials like " IS2062" which are not permitted by ASME section I be used for hydro test covers as they are just temporary parts which will be cut off after the hydro test

Ramsri. www.thermalindia.com

RE: NOT permitted materials

Any material welded to a Code pressure part needs to comply, even if it is just temporary. That material has the potential to mix into your Code material. I'm not familiar with that particular material, but keep in mind that materials can be certified to comply.

RE: NOT permitted materials

Quote (henderrj)

Any material welded to a Code pressure part needs to comply, even if it is just temporary. That material has the potential to mix into your Code material. I'm not familiar with that particular material, but keep in mind that materials can be certified to comply.

The above quote is an incomplete statement. If the query related to Section VIII Div. 1, the proper ending of the sentence would be "... with VIII-1 UG-4." The argument must further be made that the temporary test cap is not a part of the Section VIII construction and thus is not a "pressure containing part" as far as the Code scope is concerned.

Given, however, that the query related to Section I, the proper ending to the sentence would be "...with PG-10." Again, the argument could be made that the temporary test cap is not within the scope of Section I.

Any concerns with material dilution can easily be addressed by extending the Code component by an inch, then cutting to final dimension after the test, thus cutting out the weld and any potential dilution issues.

RE: NOT permitted materials

jte,
I've actually been doing research for a training on this today. I agree with everything you said, and I have another question for you:

In reference to Sect. VIII, Div. 1, and using ramsripaven's example of a pipe nozzle with the Code boundary ending in accordance with U-1(e)(1)(-a):
The Code ends at the weld joint, and doesn't include the weld, per U-1(e)(1)(-a). Interpretation VIII-1-89-115 backs this up. That's not saying that a non-Code welder could weld that joint, without a weld procedure, because you would still be bound by UW-47/48 (Still under construction during the hydro). The material needs to be in accordance with UG-4(b) for this as well. However, interpretation VIII-1-83-282 says that piping welded to that joint doesn't have to conform to Sect. VIII, Div. 1. How could that be the case? That's piping welded to the Code boundary, so that would be equivalent of someone welding non-Code material to the shell.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources