INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Flowable Fill (CDF) Under Retaining Wall Foundation

Flowable Fill (CDF) Under Retaining Wall Foundation

Flowable Fill (CDF) Under Retaining Wall Foundation

(OP)
I am designing a spread footing retaining wall to replace a pile supported retaining wall. The wall is adjacent to the abutment wall of road underpass for a railroad bridge. The road is being realigned so they are removing the pile supported wall and putting a spread footing one in the same general area. It was suggested to use 2' flowable fill under the spread footing to provide a more solid base than the soil because there are worries about settlement of the soil under the current pile supported base because it hasn't been loaded. Settlement would be bad because the wall needs to stay aligned with the abutment wall of the bridge because there is a sidewalk. The current design is barely passing sliding and bearing checks. Is a CDF under the footing a good idea? Are there any other suggestions? Is potential settlement an issue? Thanks.

RE: Flowable Fill (CDF) Under Retaining Wall Foundation

lots of questions that need to be answered.

  • well, for starters what does your geotech say about it?
  • have borings been done and has a settlement calculation been completed?
  • will 2 feet of overexcavation eliminate settlement?
  • will deepening the footing by 2 feet increase your allowable bearing strength?
  • i dont believe this addresses your sliding problem
  • RE: Flowable Fill (CDF) Under Retaining Wall Foundation

    I would think the friction coefficients between the footing and flowable fill would be lower than if it were soil. The flowable fill isn't very well cemented and you can create blemishes in the surface with your finger. At least the type they use in my area. I think sliding becomes a bigger issue then and you would need to add a shear key.

    Will they be removing the existing piles? If so I can see settlement being an issue since you are disturbing all that soil when you extract them. If you are cutting them below grade and leaving them in place I can't imagine settlement being an issue unless you have poor soils.

    If settlement is a concern, preload the site. Hopefully you have a geotechnical report that has some recommendations, if not I'd certainly get one done.

    Red Flag This Post

    Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

    Red Flag Submitted

    Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
    The Eng-Tips staff will check this out and take appropriate action.

    Reply To This Thread

    Posting in the Eng-Tips forums is a member-only feature.

    Click Here to join Eng-Tips and talk with other members!


    Resources