INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NBIC Alteration – R-2 Form – Design Performed by:

NBIC Alteration – R-2 Form – Design Performed by:

NBIC Alteration – R-2 Form – Design Performed by:

(OP)
Please refer to: NBIC Code Part 3 Sections 3.2.4 (b), 3.2.5, and FORM R-2

Background:

Often times an fabricator "R" organization constructs the parts to be used in and Alteration only, and a different installer "R" organizations installs the parts in the field. Both "R" stamp holders are required to sign a FORM R-2 certify the work they performed. Calculations are often contracted out by the fabricator "R" stamp holder.

Section 3.2.4 (b) states, in part, that the "R" certificate Holder performing alterations shall establish the construction standard of code and sufficient controls to ensure that all required design information, applicable drawings, design calculations ...... are prepared , obtained, controlled, and interpreted to provide the basis for an alteration in accordance with the original code of construction.

Section 3.2.5 states, in part, that all design calculations shall be completed by an organization experienced in the design portion of the standard used for construction of the item.

Question: When calculations are contracted out by the fabricator "R" organization, does the fabricator "R" in completing the FORM R-2, Report of Alteration:

1. Fill in Line 1a. of FORM R-2 with the name of the organization that was contracted to and performed the design calculation for the Alteration, or
2. Fill in Line 1a. with the name of the fabricator "R" organization

RE: NBIC Alteration – R-2 Form – Design Performed by:

The organization holding the R Certificate for design fills this out. They have the ultimate design responsibility not the subcontractor.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources