INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

(OP)
I am trying to figure out if there is a rule of thumb for estimating the length of a sheet pile that is cantilevered and anchored. Also, is there a particular reference that this discusses this.

Thanks

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

My initial guesses for embedment depths are around the following numbers:
Cantilevered: 2 * Retained Height (i.e. length = 3 * retained height)
Anchored: 1* Retained Height (i.e length = 2 * retained height)

Hope it helps.

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

The rule for cantilevered sheet piling I use is 1/3 above and 2/3 below. I don't know of a rule for anchored, I think it's more dependent on the location you anchor which could depend on a variety of factors. I'm sure someone has a much better answer for you.

Avscorreia beat me to it.

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

From a historical viewpoint, by the 1930's steel sheet pile had been in use for several decades. Therefore, there was significant experience with what worked and what did not. At that time, Carnegie-Illinois Steel (a predecessor to US Steel) published "experienced" based guidelines that can be summarized as follows:

Cantilevered: "Penetration below the bottom should equal approximately the unsupported height above."

Anchored: Penetration below the bottom should equal between 20% to 75% of the distance from the tie rod to the bottom. Percentage determined by judgment of soil conditions and depth of channel (for waterfront structures).

You can read the exact wording and proper context from the 24th page of "US Steel Sheet Piling Design Extracts", located on my website:
http://www.slideruleera.net/Steel-Piling.html

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

SRE...making us all look like amateurs again!!....but much appreciated! U da man!

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Thanks, Ron. I'm just glad a few questions come up where an answer can be found in the past.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

Thanks for the info, SRE. My guess for cantilever walls is for a safety factor of 2.0 on Rankine passive pressures and using the simplified fixed earth support method. For lower safety factors and different earth pressure coefficient calculation methods, these embedment depths fall quite drastically.

I've created a simple spreadsheet for the calculation of penetration depths for cantilever walls and did a quick parametric study, varying friction angle and getting D/H ratios. If someone is interested, it can be found at the following link:

https://www.dropbox.com/s/fyj2ue8jfmqysct/CantRetW...

RE: Rule of thumb for Estimating Sheet Pile Length for Cantilevered and Anchored Sheet Pile Lenghts

(OP)
Thank you, really appreciate your help. Do you guys know if there is a similar rule of thumb for shoring (soldier piles - H-piles with wood lagging)? Thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close