INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Shear breakout at top of concrete pier.

Shear breakout at top of concrete pier.

Shear breakout at top of concrete pier.

(OP)
Hi all,

Here is a question I've been trying to find an answer for. I attached a sketch to clarify.

ACI 318-11 Section 7.10.5.7 requires you to have ties in the top 5" of a column (or pier) to "improve load transfer from the anchor bolts to the column or pier..."

ACI3 318-11 Appendix D.4.2.1 says where anchor reinforcement is provided in accordance with D.6.2.9, breakout can be neglected and the steel is designed to carry the load.

My question is, can the ties required by 7.10.5.7 be designed to carry the load in accordance with D.6.2.9 for the situation in the attached sketch?

Thank you for any advice.

RE: Shear breakout at top of concrete pier.

Quote (op)

My question is, can the ties required by 7.10.5.7 be designed to carry the load in accordance with D.6.2.9 for the situation in the attached sketch?

I vote yes, tepidly. That is essentially the idea with this strut and tie method for anchorage design: Link. For serious loads, I prefer the strut and tie method. While not explicitly stated as such, I feel that appendix D is the domain of smaller scale things. It really gives no direct consideration of the concrete struts involved in the load transfer method and was developed primarily with unreinforced concrete in mind.

Disclaimers aside, one of the first things that I'll do in the design of a laterally loaded pier is to see if I can get enough stirrups at the top of the pier and near to the anchor bolts to deal with 100% of the applied shear (phi = 0.75). It's a good start.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Shear breakout at top of concrete pier.

(OP)
Thanks, KootK!

RE: Shear breakout at top of concrete pier.

Based on the sketch, I'd be cautious doing that. The commentary has some verbiage about using stirrups and ties, I'm looking at RD.6.2.9 in the 2008 ACI Code. Not to discourage you, but I'd read through the commentary and get a good feel for it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources