INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Machine base grouting curing time/Loading the machine base

Machine base grouting curing time/Loading the machine base

Machine base grouting curing time/Loading the machine base

(OP)
Dear all,

We are doing the grouting for steel structure base for HRSG.
Need to know the curing time/Exact time for Loading the structure (i.e installing the modules/Equipment)

Understand that,curing time 28 days for grouting cements for achieving compressive strength

RE: Machine base grouting curing time/Loading the machine base

arunsiva - The 28 day compressive strength of both grout and concrete is a widely accepted standard to evaluate and compare the products. There is nothing special about the time being exactly 28 days. To determine when the structure can be loaded, compression test results of standard grout samples should be performed by qualified individuals. There is no exact time that can be precisely predicted when the grout will reach the strength required by the design engineer. This is true for the heavy loads put on a foundation by the Heat Recovery Steam Generator (HRSG) of a combined cycle power station or for any other grouted base plate.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Machine base grouting curing time/Loading the machine base

(OP)
Sir,(SlideRuleEra)
Thanks for your valuable information

RE: Machine base grouting curing time/Loading the machine base

Many times - but all! - the static weight of the machine itself or equipment can be resisted much, much earlier (for simple construction purposes) than the operating (dynamic) final loads.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources