CHS connection design
CHS connection design
(OP)
Hi,
New to this forum. I have a problem that I have not yet been able to find an answer to online and would appreciate any help anyone can offer. Mostly just looking for reference material which would help with the problem.
I have a CHS that I am inserting into a another CHS (so CHS-1 O.D. 500mm, CHS-2 I.D. 500mm), once fitted together they will be bolted (there is access for this). This is similar to a Nailed connection type.
Any links to information to this type of connection would be great.
Cheers
New to this forum. I have a problem that I have not yet been able to find an answer to online and would appreciate any help anyone can offer. Mostly just looking for reference material which would help with the problem.
I have a CHS that I am inserting into a another CHS (so CHS-1 O.D. 500mm, CHS-2 I.D. 500mm), once fitted together they will be bolted (there is access for this). This is similar to a Nailed connection type.
Any links to information to this type of connection would be great.
Cheers






RE: CHS connection design
I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.