INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Piles: To batter or not to batter?

Piles: To batter or not to batter?

Piles: To batter or not to batter?

(OP)
Recent studies suggest that battered piles do not perform well in liquefiable soils during a seismic event, and that piers and wharves supported by battered piles have historically not done so well in past earthquakes because they attract significant loads and typically fail the deck, pile or both.

Thus the modern practice in moderate to high seismic zones is to design piers and wharves supported on plumb piles as the lateral SFRS.

What happens if you have a large piece of material handling equipment (over water) that requires a fairly rigid in-water foundation? You still have to design the foundation for seismic, and maybe even take a lower R-factor, but it seems like an all battered pile configuration is most efficient for these structures. It would sure reduce the total number of piles and minimize lateral deflections of the equipment under operating loads.

But this goes against the trend that seems to be "no battered piles".

What do you all think?

RE: Piles: To batter or not to batter?

Without going into all the reasons, we use only vertical piles on all the wharves and piers we do for the Navy. There are usually crane rails with at least one rail on the outboard edge, and we reduce the spacing of the piles at the crane beams. The whole thing has to be designed to function with the loss of any one adjacent pile or any two piles in the worst locations. We design for failure and a series of vertical piles in bending fail more better than a fewer number of "hard" batter piles.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources