INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Preparing to design concrete beams/slab for crane tie-ins

Preparing to design concrete beams/slab for crane tie-ins

Preparing to design concrete beams/slab for crane tie-ins

(OP)
Hi all, I'm having some difficulty figuring out the load path taken by the forces from crane to strut to embed connection. I've attached several drawings to present the situation, it's pretty typical I believe. The crane has 3 struts tying into 2 "shoes" made of several plates welded together.

One thing I'm wondering about is, does the height of the "crane box" - or where the struts attach the the crane - does it's height above the slab matter? I was told that this 2'-10" will cause a greater moment than if it were level with the shoes, but I'm having trouble understanding why. They've given us forces in the struts, which are the entirety of forces that will be transferred to the shoe; why does it matter where the box is? I'm thinking this only affects the horizontal and vertical components of forces. To me, it's significant that where they enter the shoe is some distance above the slab so there will be a small moment there, but that's all I see.

The next thing is, I was planning on using these strut forces and finding the horizontal and vertical components. The vertical would be point loads, while the horizontal I would turn into a moment with the distance being top of slab to strut connection. Does this make sense? And then I would analyze the slab with a point load and point moment.

Thanks for any guidance, suggestions, or other input.

Structural Engineering Intern

RE: Preparing to design concrete beams/slab for crane tie-ins

Xp1:
There was at least one other thread on this same topic a year or two ago. Search in the Structural Engineering forum, this forum #507, I remember participating in it. Yes, your sketches/attachments are pretty typical of those crane conditions. Your general approach seems right to me. You should resolve the strut loads into x, y & z load components at the pins on the two shoes, and then resolve these into the slabs. Sometimes easier said than done. In some cases you may wish you had some shear lugs welded to the underside of the shoes. The crane company supplies the shoes or do you? In either case you may want to check the shoe stresses under your load set. Obviously, you gotta miss the slab rebar, and the bolting may be through bolts.

RE: Preparing to design concrete beams/slab for crane tie-ins

Note that the strut forces enter the shoe both vertically and horizontally offset from the center of your bolt group. In this case, they should offset each other w.r.t. moment, but that may be the root of the concern from someone giving it a first glance.

Another thing to consider is that the strut or shoes may only be rated for operation within a certain angle from horizontal -- I've come across that before.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources