UG-22 Checklist for vessel required?
UG-22 Checklist for vessel required?
(OP)
We design tanks based on general conditions supplied by our customer.
Basic Section VIII tanks with some nozzles.
My AI just recently requested a UG-22 checklist.
I am never provided with these "supplementary" conditions.
What do i tell my AI?
Am I responsible for UG-22 loadings if they are not provided to me?
Am i required to request them?
Basic Section VIII tanks with some nozzles.
My AI just recently requested a UG-22 checklist.
I am never provided with these "supplementary" conditions.
What do i tell my AI?
Am I responsible for UG-22 loadings if they are not provided to me?
Am i required to request them?





RE: UG-22 Checklist for vessel required?
How you consider is based on what is described in your Quality Manual - this activity can be outsourced under your control or by use of a check sheet or computer software. All it means is that you considered the loads in design.
RE: UG-22 Checklist for vessel required?
What about tank manufacturers that fabricate and sell off the shelf Sect VIII stamped tanks for unknown end applications?
RE: UG-22 Checklist for vessel required?
In a perfect world, the buyer would inform you of all applicable loadings. This rarely happens.
I suspect that your AI is looking for some kind of statement that you have considered UG-22 loadings, even if only informally. I doubt he is looking for anything more than that, i.e the actual calculations.
Regards,
Mike
The problem with sloppy work is that the supply FAR EXCEEDS the demand
RE: UG-22 Checklist for vessel required?
Yes. The AI was not pushing hard for it, just like you said, looking for a statement of consideration. I just have an issue filling out a UG-22 checklist when the reality is i dont have the data required. I suppose requesting it is all i can do.