INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Wood Shear Wall to Meet 2012 Energy Code

Wood Shear Wall to Meet 2012 Energy Code

Wood Shear Wall to Meet 2012 Energy Code

(OP)
I am starting to get more projects that are under the 2012 Energy Code. Normally I don't bother with this and let the Architect figure it out but with the new code it seems there is a clause to have continuous insulation. From what I have been told this means that the insulation between the wood studs is no longer adequate. The Architect is claiming we have to have 5" of rigid foam insulation on the exterior of the building. So I will have 5+" long screws with washers to hold the insulation to my wood sheathing but then I do not have any way to attach the siding unless I again have 5+" screws through the siding and insulation. Is anyone else running into this? How is everyone meeting the continuous insulation requirements for wood framed structures? Is the Architect forgetting to mention an exception for this?

Thanks,

RE: Wood Shear Wall to Meet 2012 Energy Code

Mine never have more than 1 1/2" of foam. They usually attach furring strips thru the foam into the studs and attach the siding to that. For lap siding, the furring strips bear on the foundation to prevent prying of the screws. For vertical siding, the siding bears on a treated member on the foundation for support.

RE: Wood Shear Wall to Meet 2012 Energy Code

I've been told something similar to XR250, they just need a thermal break at the studs. Therefore still provide the batt insulation between the studs for the majority of the insulation value, then add 1 1/2" of rigid to the outside.

RE: Wood Shear Wall to Meet 2012 Energy Code

(OP)
Anyone using the ZIP panel system?

RE: Wood Shear Wall to Meet 2012 Energy Code

cfox -

It seems your are at the mercy of the architect now unless you cn come up with an alternate solution. Wood is recognized to be a "thermal short-circuit".

There is an alternate method that eliminates the short circuit by using 2x4 studs for a 6" thick wall that allows for flexibility (and lesser thickness of exterior foam.

The wall is on a 2x6 plate with two layers (inner and outer face) of 2x4s offset by half of the spacing so there is NO direct heat path. This allows batt insulation (better than nothing) to be placed horizontally, woven between the alternating studs. In some cases, the studs can be spaced at 24" o.c. if the longitudinal shear loads are not great and the vertical wall strength is improved.

Dick

Engineer and international traveler interested in construction techniques, problems and proper design.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources