×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NEC Emergency System Selective Coordination Requirement

NEC Emergency System Selective Coordination Requirement

NEC Emergency System Selective Coordination Requirement

(OP)
2011 NEC 700.27 states that emergency system OCPDs shall be selectively coordinated with all supply side OCPDs.

My question is regarding the wording of "all supply side OCPDs" Does this include the normal source of the automatic transfer equipment?

My interpretation is that coordination requirement applies to devices on the load side of ATS and alternate source side (emergency side). This seems to agree with definition in 700.2 which indicates that the intent of the emergency system is to automatically supply power to selected loads in the event of failure of the normal source. To me this indicates that the normal source supply upstream of the ATS is not part of the emergency system.

NFPA 110 also defines Emergency Power System Supply as a complete functioning Emergency Power Supply (EPS) system coupled to a system of conductors,disconnecting means and overcurrent protective devices, transfer switches, and all control supervisory, and support devices up to and including the load terminals of the transfer equipment needed for the system to operate as a safe and reliable source of electric power. Even here there is no mention of the normal power source upstream of the ATS.

In addition, practically speaking, in the event of a fault downstream of device on the load side of the ATS and mis-coordination with the device upstream on the normal source side, the ATS will simply sense loss of normal power and start the transfer sequence to emergency source. Once transferred to emergency source, I can see the importance for total coordination requirement. I also believe that achieving total coordination on the normal side is ideal but sometimes it is completely impractical in the instantaneous region due to the magnitude of available fault levels. I do not understand how this can be required in the NEC?

I was just curious what are your experiences, opinions, facts... regarding this requirement and dealings with the AHJ in the NEC world?

"Throughout space there is energy. Is this energy static or kinetic! If static our hopes are in vain; if kinetic ù and this we know it is, for certain ù then it is a mere question of time when men will succeed in attaching their machinery to the very wheelwork of nature". û Nikola Tesla

RE: NEC Emergency System Selective Coordination Requirement

It required on every project i have ever done.

When an elephant is in trouble even a frog will kick him.

RE: NEC Emergency System Selective Coordination Requirement

(OP)
neher, can you explain further your meaning that is was always required? Did you have scenarios on the normal source where the fault levels were above the tested combinations levels? What was your solution to breakers where instantaneous trip curves overlap? I do not see how this is even practical on stiff system with molded circuit breakers and branch circuits where instantaneous curves overlap? Also, as I noted above, I do not think it's reasonable to conclude that the normal system is part of the emergency system by its very definition in the NEC and NFPA 110.

"Throughout space there is energy. Is this energy static or kinetic! If static our hopes are in vain; if kinetic ù and this we know it is, for certain ù then it is a mere question of time when men will succeed in attaching their machinery to the very wheelwork of nature". û Nikola Tesla

RE: NEC Emergency System Selective Coordination Requirement

(OP)
The inspector is indicating that the normal system upstream of the ATS has to totally coordinate as well all the way to the main. I do not understand how the NEC can be interpreted that way. Does anyone have any experience with similar issues?

"Throughout space there is energy. Is this energy static or kinetic! If static our hopes are in vain; if kinetic ù and this we know it is, for certain ù then it is a mere question of time when men will succeed in attaching their machinery to the very wheelwork of nature". û Nikola Tesla

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources