×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Staged Construction development

Staged Construction development

Staged Construction development

(OP)
Dear Colleagues,

I need to develop staged construction manual guideline on which theoritical basis it operates and which method one have follow if one wants to derive it (on mathematical and structural engineering basis). Neeedless to say that, in order to prove the validity of that guidline it needs to be backed up with examples where very simplistic structures(no time dependent properties) should converge with contemporary computer calculations.

It seems that for the first time the google search didn't retrieve anything useful or probably I couldn't comprised very elegant search query for that. Interestingly there is not much on the literature about staged construction also, even if there is it mainly includes references to the CSI SAP2000 implemention of staged construction. So I'll ask for your guidance on which way to follow in order to fullfill that task?

Regards,

RE: Staged Construction development

What are you trying to build; can you be a little more descriptive? In my line, when we talk about "staged construction" it means we can't build the full width or length of a bridge in one shot, so we do it in stages.

RE: Staged Construction development

(OP)
The goal is to find the general procedure(as starting point mainly for buildings) for staged construction which will serve as basis for software implementation. If I need to put it in another words and more explicitly: If possible, extract or esitamete the procedure of SAP2000, Lusas, Robot Structural how they perform staged construction and formulate it.

I hope that I've well versed that,

Regards,

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources