×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Can prestress wires in PC. pile sustained tension in pier

Can prestress wires in PC. pile sustained tension in pier

Can prestress wires in PC. pile sustained tension in pier

(OP)
Could anyone has idea about using prestress wires in PC. pile to transfer tension in pier. My colleague in office say that in case of piles subjected to tension due to wind such as in PEB building were penetrated too short and dowel have to cut out to reach design pile top level, we can sonsidering to use their prestress wires to transfer this force. For me i'm disagree with him.
       Did somebody out there has experienced with this. In case of can, how can we calculted embeded length to concrete. I cant find some helpful sources in ACI for embedded length of these wires except doformed and weld wire fabric.
      Assume that a pile was subjected to 16 kips in tension and no problem from soil only the way to transfer tension through pile only.

Thanks.

RE: Can prestress wires in PC. pile sustained tension in pier

Gtoyo,

We have used the prestressing strands (3/8" to 1/2" in diameter) in the concrete piles to transmit the tension forces from the pile cap to the piles.    We specify the additional length of pile needed to provide the length of the strands required to transmitt the tension forces by bond with the concrete.    The top of the pile has to be cut after driving, without damaging the strands.   The strands have to be supported from the pile cap rebars to insure they extended into the pile cap and do not lay flat on the bottom.   

As an alternative, rebar dowels could be epoxy set in drilled holes in the top of the pile.

Regards

AEF

RE: Can prestress wires in PC. pile sustained tension in pier

(OP)
Dlew
     In case of PC. wires , do you have an idea how to calculate development length to tension force.

RE: Can prestress wires in PC. pile sustained tension in pier

Gtoyo,

A prestressing strand manufacturer could answer the question about the developing length beter than I could.   It has been quite a while since I designed my last transmission tower foundation using prestressed concrete piles.

regards

AEF

RE: Can prestress wires in PC. pile sustained tension in pier

If you have exposed the wires anyway, why not simply tension them and have anchorages in chases cut in the sides of the pile caps?

Abhijeet Oundhakar
Design Engineer
Rashid Al Owais Engg. & Consulting
Sharjah, UAE

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources