AASHTO Interims
AASHTO Interims
(OP)
The pages can't simply be replaced anymore (for some time now...) and the way AASHTO prints them, they don't line up well with the format. How is everyone organizing the Interims to the LRFD Bridge Design Spec?
Are you making notes in the original and just stating to see the Interims? I'm trying to find a good way to keep it organized and obvious that there's a revision without having to dig through multiple pages.
They are getting way out of control with this code. As much as we pay they should at least make it simple to replace...
Are you making notes in the original and just stating to see the Interims? I'm trying to find a good way to keep it organized and obvious that there's a revision without having to dig through multiple pages.
They are getting way out of control with this code. As much as we pay they should at least make it simple to replace...





RE: AASHTO Interims
RE: AASHTO Interims
Honestly, why in the world do you need interims when you put out a NEW code every TWO years. AASHTO is out of control.
RE: AASHTO Interims
As a matter of perspective: The 53 AASHO (6th Edition) is 6" x 9", 328 pages. The 77 AASHTO (12th Edition) is 6x9, 496 pages. The 83' AASHTO (13th Edition) is 8 1/2 x 11, 387 Pages. These editions included the construction specs.
Current LRFD design specs, 7th Ed 1704 pages
RE: AASHTO Interims
It would be nice if the DOT could keep them in check and lengthen the code cycles.
RE: AASHTO Interims