INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

removal of 122 year old King Bowstring bridge pilings

removal of 122 year old King Bowstring bridge pilings

removal of 122 year old King Bowstring bridge pilings

(OP)
I am a consultant with a group named Workin' Bridges who restore and move old bridges. I am currently working on removing the iron pilings from an 1883 King Bowstring bridge salvage from the Skunk River in Iowa and reconditioned. The bridge is now in Deleware but without its original 33' long riveted pilings. They appear to be the last such piling surviving and their intact extraction is critical to the project.

My query is what is the best method to remove these 122 year old pilings with minimal damage?

RE: removal of 122 year old King Bowstring bridge pilings


Could you post some photos? I found this website but not much help.

http://www.skunkriverbridge.org/description.html

To me riveted piling sounds like a Phoenix Column (see photo) but on that website, from what I could see, I was wondering if you meant steel pier.


RE: removal of 122 year old King Bowstring bridge pilings

marlinarchy - I was a bridge contractor many years ago. IHMO, the first technique is to try jetting around the perimeter of a pile. Success will depend on the depth of pile embedment and the soil, jetting works well with sandy soil or "mud". The pump used for this does not have to be very sophisticated. A 2" centrifugal pump with the jet being a length of Schedule 40, steel pipe is an inexpensive way to start. Nominal 1 1/4" pipe is a good match to use as the jet for a 2" pump, a good compromise of water velocity and flow volume. This outfit is small enough to be worked by hand. You probably will need a crane, or winch to provide a small upward force on the piling while the jetting is going on. Can takes a lot of patience.

If the piles are larger, or deeper, try a 3" or 4" pump. Another trick is to modify the jetting pipe so that compressed air is injected into the water steam at the top of the pipe. The combination of water / air may improve results. Try just water first.

With care, jetting is not going to damage anything, even if it does not work on your project. It is a lot less damaging than using a pile extractor, or just jacking on the piling alone.

If jetting is not practical, or does not work, the next technique I would use would be a small earth auger parallel to and a short distance from a pile.

If you have any questions on this, I try to answer them.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources