INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Time between excavating and concreting a bored pile

Time between excavating and concreting a bored pile

Time between excavating and concreting a bored pile

(OP)
Good day,

2 questions please :
what is the maximum time allowed between excavating and concreting a bored pile without affecting pile integrity ?Is 24 hours ok ? I couldnt find anything in the specs.
2- if a bored pile is concreted, can we begin directly excavating the adjacent pile which is 3x diameter far ?
Thank yiu

RE: Time between excavating and concreting a bored pile

Our general notes say that holes must be filled the same day they are drilled and that no more than 3 holes can be open at one time. So basically they should get a 3 hole headstart in drilling when you start to fill the first hole, and stop drilling when there is only time to fill the remaining holes.

But that's just our office notes (and come to think of it, my previous office as well). I do not know where these rules came from.

RE: Time between excavating and concreting a bored pile

Common sense, I think, jayrod. That has always been my stance as well. As to the second question by the OP, wait until after the first pile is filled. Would depend on the soil type, but it is not worth the risk.

RE: Time between excavating and concreting a bored pile

(OP)
Ok thank u jayrod12 and hokie66

RE: Time between excavating and concreting a bored pile

Actually I missed an important point, our notes also include that you should not have to directly adjacent pile holes open at one time. So as hokie said, don't drill two adjacent piles, fill the first one. If you desire to leave a few (one or two) open while you are filling one then you should drill every other pile and then come back and infill the gaps.

RE: Time between excavating and concreting a bored pile

(OP)
Another thing por favor.

A working pile load test is required for a pile under the abutment. 2 piles are casted and one of these piles will be subject to the test.
4 anchor piles will be drilled, one of these piles will be really close to the second pile which will not be subject to the test. The second pile has been casted today and the contractor is asking if he cam drill tomorrow the anchor pile (which will be very near). Is this ok ? I dont have the minimum diatance of 3 diametera since the anchor pile wont be used in the working conditions of the bridge and i dont know if drilling after 24 hours may affect the concrete section of the pile poured one day ago.
thanks a lot

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources