INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Existing Deficient Vaulted Rafter Condition

Existing Deficient Vaulted Rafter Condition

(OP)
I'm working on a project that I was hoping to get a second opinion on. The project consists of remodel / addition to an existing home that was built in the 1950s. In the center of the house there is an existing vaulted Living Room. At the peak of this vault there is no ridge beam. Instead, one side of the vaulted rafters cantilever between an existing porch beam and the exterior wall to support the other rafter that is clear spanning between the exterior wall and the ridge. The rafters are tied down to the porch beam, the porch beam to the posts, and the posts are anchored ~2'-0" into the foundation. The backspan-to-cantilever is approximately 1.25:1. At the ridge the rafters are half lapped together with a metal strap applied across the top of them. The rafters are exposed 4x12s at approximately 6'-0" oc. (See attached photo for existing drawings)

As part of the project, the architect is planning on removing the porch beam and replacing it with a new wall (building addition under roof at porch) as well as revising some of the openings in the existing exterior wall at the cantilevered rafter. Since we are tinkering with this existing condition, it's my opinion we are "buying it" and therefore need to make sure that it meets code and is a safe condition. Even if we don't touch the area at all, I am a little concerned with it and my liability.

My main concerns are:

1) The cantilevered rafter is approximately 2x overstressed assuming DF #1. This is likely "old growth" wood and stained / exposed, but there are some knots in the members at the top & bottom which makes me want to use a lower grade.

2) There is an expected uplift force of 1500# at the porch beams. We would be cleaning up this condition with new footings, tiedowns, etc., but I don't like the idea of such a large constant tension in a gravity condition, as small slip in bolts/screws lead to large deflections.

3) The connection at the ridge concerns me with the half lap. The notch is 50% of each member and therefore exceeds the 25% notch allowed per NDS. It appears from my site visit that the rafters have rotated a bit at the ridge as the gap is larger at the bottom (appeared to be about 1/4" to me, but I did not directly measure). To me this rotation then concentrates a large force at the end of one notch, raising my concern with splitting even more. The strap at the top of the rafters seems to only help tie them together at the lap and to provide some uplift resistance.

4) The rafters appear to have split slightly (almost looks like checking) but appears to be in line with one of the notches (see photo)

The condition has stood for the last 60+ years so I know the architect is resistant to modifying it as arguably the revisions we are making do not impact the ridge connection or the design of the rafters. Regardless, I still don't like it and feel it's my responsibility to clean it up.

If the cantilevered rafters were not overstressed, I was considering adding side plates at the ridge connection to reduce forces on the notch as well as making sure the uplift was properly addressed at the backspan. However, with them overstressed I would like to either add a new ridge beam, add rafter ties (threaded rod or joists), or possibly convert the rafters to flitch beams with plates (probably cost prohibitive and not arch desirable).

Looking for a second opinion. What do you all think is the responsible thing in this situation? Any other unique ideas for a fix?


RE: Existing Deficient Vaulted Rafter Condition

Hmmm.. looks thoughtfully engineered for the day, and beautifully drafted... would like to see more of the plans...

Are there additional load to be added to the roof, either by your current project, or by code increases in snow? Are there demanding wind or seismic requirements?

RE: Existing Deficient Vaulted Rafter Condition

(OP)
The plans in general are really well engineered (even custom holdowns brackets out of angle iron). However, I really don't like this vaulted connection. Its really the notch and back span ratio that has me most concerned.

No snow loads. High seismic, but connection is strapped together at top. Our work isn't really adding any loads except for a small decorative dormer at the back span (would help condition actually -- at least deflection). Original drawings show shake roof but there is tile currently which has been there for at least 20+ years. (Was there before current owners)

RE: Existing Deficient Vaulted Rafter Condition

2 collar ties each rafter; eliminates ridge beam and creates a truss. Create moment splice at rafter cantilever area or add bearing at house/porch wall eliminating cantilever.

Inspector Jeff

RE: Existing Deficient Vaulted Rafter Condition

Is it 2x overstress using older allowable stress values? This is usually a tough call. If you're not increasing or changing the load on the cantilever member then I don't think code requires you to strengthen it, but I'm not certain. However if you are 2x overstress and the connections are in poor condition then I would consider some repairs.

I don't think the architect would go for collar ties, but hey, you never I guess.

EIT
www.HowToEngineer.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close