INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HEC-RAS and Manning's Roughness for large rock

HEC-RAS and Manning's Roughness for large rock

HEC-RAS and Manning's Roughness for large rock

(OP)
Does anyone have any experience with using manning's values in HEC-RAS for a streambank stabilization as part of a flood study? We will need to use rock with an avg. Diameter of approximately 3' or more for very large flows. I can't seem to really nail down any definitive values. And most of the information i've found is for channel protection more so. Also, the depth varies from about 1.5' at OHW to 27' at the 100-yr and i'm trying to determine the best way to model something such as this. Any assistance would be great. Not that it matters, but i'm in VA.
Thanks in advance.

RE: HEC-RAS and Manning's Roughness for large rock



try chapter 5

U.S. Army Corps of Engineers
Engineer Manual EM 1110-2-1601
Engineering and Design HYDRAULIC DESIGN OF FLOOD CONTROL CHANNELS

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources