INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CIP Box Culvert

CIP Box Culvert

CIP Box Culvert

(OP)
Using the LRFD Specifications, for fills less than 2', how do you apply the live load for Case 2 (Traffic Travelling Perpendicular to Span)? I understand you determine the primary strip widths for positive and negative moment, but how do you apply them to the top slab? I'm coming-up with large moments so I do not believe I'm distributing the live load correctly.

RE: CIP Box Culvert

The way I read the provision, it's either, or: either traffic runs parallel to the span of the culvert or it doesn't To me, Load case 2 would apply to something like a buried pipe running parallel to traffic, hence the span being perpendicular.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources