INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

(OP)
ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1). When or under what circumstance does the wording “impractical” permit the use of table 56.1 for lower temp PWHT in production of a PQR?

Regards,
Jon

RE: ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

The lower temp permitted PWHT pertains to the PWHT for the vessel and is not pertinent to the PQR. ASME IX governs the heat treatment parameters for procedure qualification.

RE: ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

Impractical would apply to materials installed in a vessel that could be harmed by exposure to the minimum PWHT or the geometry of the vessel (closure weld) resulting in the need for a lower temperature at longer time to achieve similar results.

RE: ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

(OP)
Thank you, Ok see that differing materials and designs makes scence here. Would the temps and hold times in table 56.1 be applicable in any other situations such as relative to equipment limitations?

For example utilization of an up to date certified older electric furnace with cyle time programming controls, recording chart, and manual heating controls which may provide some variation in PWHT temps within the time limits of table 56.1. based on weld thickness. The question is presented relative to PWHT of product, and PQR coupon, material and welding requirement include charpy testing.

RE: ASME 8 UCS- 56, Table UCS – 56 P-No 1, group 1 and 2 material PWHT, Note (1).

Quote:

For example utilization of an up to date certified older electric furnace with cyle time programming controls, recording chart, and manual heating controls which may provide some variation in PWHT temps within the time limits of table 56.1. based on weld thickness. The question is presented relative to PWHT of product, and PQR coupon, material and welding requirement include charpy testing.

No, Table UCS 56.1 would not apply for the example cited above.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources