assembly constraints, csys to csys
assembly constraints, csys to csys
(OP)
As a point of inquiry I'm wondering how other users assemble components mating csys to csys and yes, I use the datum csys feature to accomplish this.
My preferred method is to align the planes. Is there a better option?
NX9.0.3.4 MP1, Windows 7
My preferred method is to align the planes. Is there a better option?
NX9.0.3.4 MP1, Windows 7
NX9.0.3.4 MP1/Windos 7 Service Pack 1





RE: assembly constraints, csys to csys