INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tube Bundle pulling out

Tube Bundle pulling out

Tube Bundle pulling out

(OP)
Dear all,

we have a plan tu replace heat exchanger tube bundle at offshore facility with the new one but we have a problem method to pulling out this bundle.
first option, we will make sliding table and we will pull this bundle using high load rope puller. this bundle have weight 25 tons
i wanna ask anyone if have similiar experience for this work

Regards
Joe

RE: Tube Bundle pulling out

Though I'm no expert re this bundle removal operation, it may be useful if you stated the TEMA configuration of this HEX.

RE: Tube Bundle pulling out

I have done exactly similar project for an offshore facility in North Sea (From procurement till installation procedure). Explaining all here in this forum looks like a huge task. If you can tell me at what stage the project is, I can guide you well.

RE: Tube Bundle pulling out

(OP)
yes i know, many people usually using aerial extractor but very expensive to mobilize this equipment to pull out only 1 tube bundle . because of this bundle weight not too heavy, i have plan to fabricate sliding table combine with high load rope puller (hydratight) for pulling out and using offshore crane for lifting.
any body have idea with competitive cost ?

RE: Tube Bundle pulling out

We used Trolley with wheels for moving new and old bundles. I think you have made plans for pulling out the Bundle. Attachment will guide you for inserting the new bundle. Apart from the new bundle cost,keep in mind cost of temporary equipment including certified slings and shackles. Account for enough man hours, we underestimated it.Prepare a risk matrix as well for flange face and Exchanger body deformation(Our Exchanger body lost its shape and we faced problem inserting the new one).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources