Welding Procedure for SA 724 Gr.C
Welding Procedure for SA 724 Gr.C
(OP)
Hi Everyone,
I would like to ask assistance on developing WPS for butt welding of SA 724 Gr.C plate 38mm thick using FCAW Process. Are there any resources you can give to study the welding and cutting process and essential/critical variables to be considered?
Thanks
I would like to ask assistance on developing WPS for butt welding of SA 724 Gr.C plate 38mm thick using FCAW Process. Are there any resources you can give to study the welding and cutting process and essential/critical variables to be considered?
Thanks





RE: Welding Procedure for SA 724 Gr.C
If required, post weld heat treatment should be performed at least 50 deg F below the original tempering temperature (1150 deg F minimum by the material specification).
The weld wire for FCAW should match the strength level of the plate.