INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ITE 15 HK 500 racking procedure

ITE 15 HK 500 racking procedure

ITE 15 HK 500 racking procedure

(OP)
What do you fell is safer in racking in a 15HK500 bkr.
1. Control power fuses in and door shut, racking Bkr all the way to connect.mind you springs charge when you reach test. Or
2. Racking breaker in with fuses out and after reaching connect, open door and install control power fuses. Springs charge when fuses installed.

RE: ITE 15 HK 500 racking procedure

Most HK's will have a motor disconnect switch, I would turn that off before racking. The best answer is to use remote racking.

RE: ITE 15 HK 500 racking procedure

Concur with Zog these days. that said, I always pulled the 'close' fuses before racking.

old field guy

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources