INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

MX Drainage for gully design

MX Drainage for gully design

MX Drainage for gully design

(OP)
I have recently been involved in a development scheme in the middle East and attempted to use MX Drainage to determine appropriate gully spacing rather than using the traditional method of a spreadsheet with calculations from DMRB Gully Spacing.

However, I had some quite significant problems. Sometimes the results matched the expected spacing whereas on occasions the spacing was half of what was expected and more worryingly, there were situations where single valleys in the model were not recognized as such by MX Drainage and the single valley appeared to have breaks, at the end of which gullies were inserted.

Has anyone had experience with this problem and have any suggestions of possible solutions to these issues?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources