Having issue to update broken view after taking section from it.
Having issue to update broken view after taking section from it.
(OP)
Hello,
I am facing some issue in UG NX9.0 to update broken view after taking section view from it. For Ex. If we have a long tube. We placed tube view in drafting environment and created tube broken view. From this broken view we will take a section view. If our tube will changed and we have to change the broken view of tube then it is not possible directly. For changing the broken view first we have to delete section view, which we had from broken view and after that we can change the broken view. For more clarification please find attached ppt. If any one having the solution to change the broken view without deleting section then please suggest me.
Thanks,
Rahul Shinde
919423349150
I am facing some issue in UG NX9.0 to update broken view after taking section view from it. For Ex. If we have a long tube. We placed tube view in drafting environment and created tube broken view. From this broken view we will take a section view. If our tube will changed and we have to change the broken view of tube then it is not possible directly. For changing the broken view first we have to delete section view, which we had from broken view and after that we can change the broken view. For more clarification please find attached ppt. If any one having the solution to change the broken view without deleting section then please suggest me.
Thanks,
Rahul Shinde
919423349150





RE: Having issue to update broken view after taking section from it.
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Digital Factory
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Having issue to update broken view after taking section from it.
Thank you for replying me.
After creating the section view from broken view. If our tube will updated and I want to change that broken view boundary, then it is not possible to change broken view boundary directly. For changing boundary we have to delete that section first which we have taken from broken view and then we can change the boundary of broken view. For more clarification please find attached movie file.
Thanks,
Rahul K. Shinde
+919423349150
RE: Having issue to update broken view after taking section from it.
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Digital Factory
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Having issue to update broken view after taking section from it.
I'm attaching that files please go through.
RE: Having issue to update broken view after taking section from it.
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Digital Factory
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Having issue to update broken view after taking section from it.
RE: Having issue to update broken view after taking section from it.
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Digital Factory
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Having issue to update broken view after taking section from it.
RE: Having issue to update broken view after taking section from it.
Remember that with the new "Broken View" function, if you're not careful with dimensions/centrelines that they will be hidden when the view updates.
NX 9.0.3.4
NX 10 (Testing)
Windows 7 64 (Windows 8.1 Tablet)
RE: Having issue to update broken view after taking section from it.
If you feel strongly about any of these issues, please contact GTAC and make your feeling known to them.
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Digital Factory
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Having issue to update broken view after taking section from it.
We are in railway business. Rails have one big disadvantage: they are too long (~25 meters) compared to their height (~180 milimeters). There are lots of drillings, machined pockets, various machined areas of different sizes.
So we need both broken and section views. You can now easily make broken view of your part, but we also need sections of that view. The only workaround is to have additional sheet on your drawing, place there view which is sectioned, and sections are pasted to your base view. Also you have manually draw section lines to your broken view (this is most irritative part of your work).
This is just for information :)
RE: Having issue to update broken view after taking section from it.
Do you have any updates on this???
Thanks,
Rahul Shinde
919423349150