INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pouring of the deck slab of a skew bridge

Pouring of the deck slab of a skew bridge

Pouring of the deck slab of a skew bridge

(OP)
I have to pour the deck slab of a skew bridge soon. After reading a bit of the literature out there on the subject, I’m getting a little nervous about the proper sequence of concrete pour to follow (i.e. perpendicular, parallel to skew, or staggered perpendicular pour).

I have a 260’ single-span 50’ wide bridge on 5 girders 10’deep, and a similar one with the same span, but 37’ wide on 4 girders; both with a skew of 39°. The slab to pour is 9" thick.

The steel installed was a hybrid of no-load fit and steel load fit, and we’re having to live with permanent girder top flange lateral displacements of ½” under steel load, and anticipated concrete pour displacements of ¾” , for a permanent total dead load lateral displacement of 1.5”

I'd appreciate the suggestions of someone who has a lot of experience pouring the decks of skew bridges.

I'm in Montreal, Canada.

RE: Pouring of the deck slab of a skew bridge

Oy... I don't have any experience to help, but just the idea of 1.5" lateral flange displacement makes me twinge.

Best of luck! I'll be curious to hear what the others suggest here.

RE: Pouring of the deck slab of a skew bridge

(OP)
Welcome to the wonderful world of skew decks.

RE: Pouring of the deck slab of a skew bridge

I'm surprised the contract plans don't specify the deck pouring sequence. It's typically required on all bridge plans in NJ. Maybe the designer can provide some input.

RE: Pouring of the deck slab of a skew bridge

(OP)
We're in Montreal, Canada - usually we leave that up to the contractor. I'm the designer.

RE: Pouring of the deck slab of a skew bridge

(OP)
not yet.

RE: Pouring of the deck slab of a skew bridge

The Contractor's available equipment, employees, access to the slab, concrete supplier capability, etc. will be as important considerations as determining an optimum placement sequence. There are usually pros and cons to any reasonable proposal. When the proposal is submitted, consider all factors not just the engineering aspects. For example, the "best" placement sequence is of no value if cold joints occur because the concrete supplier cannot make timely deliveries because of a "forced" schedule.

IMHO, the most important single engineering concern is that on any one placement, ALL of the beams are equally loaded. That would define all placements, regardless of their position, as parallelograms.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Pouring of the deck slab of a skew bridge

(OP)
Yes, you're absolutely right. Thank y'all.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources