INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

FOUNDATION PROBLEM

FOUNDATION PROBLEM

FOUNDATION PROBLEM

(OP)
which is the best solution to save a building from collapsing near a river body located 2.5m away. During dry seasons, the building is safe but when rains start the water level rises 1.8m eroding the soil around the foundation and gradually exposing it(foundation). the building is 1m above the bed of the river.??
1. a retaining wall at 1.5m from the structure
2. gabion wall at 1.5m from the structure
thank you.

RE: FOUNDATION PROBLEM

Not building the structure so close to a stream that can change course in the first place.

But aside from that, I would opt for the gabion wall and pipe piling under the building foundation.

Mike McCann, PE, SE (WA)


RE: FOUNDATION PROBLEM

Might the erosion not undermine either option? placing a fair bit of rip rap on the stream side might help control that. Gabions probably easier to build, then underpin the foundations on that side.

RE: FOUNDATION PROBLEM

Rigid retaining walls, unless very long and with "wings", can lose all their retained soil due to erosion activity getting behind them. Then, your wall serves no purpose.

RE: FOUNDATION PROBLEM

well, erosion is not limited to rigid walls. neither option is much good. what you need is a floodwall which is a very stout wall and it may not need to retain anything but water. but it will need a very deep foundation. sheet piles are often used as the cutoff.

RE: FOUNDATION PROBLEM

(OP)
Thanks guys for help. Was a little busy to reply. I used the gabion wall of unit volume 25m3 and for now its working fine. and as msquared48 suggested, the pipe piling was used for the detached structure which was in the water body. Though quite expensive, we are done withthe foundation and ready to put on the structure

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources