INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Flange Connection at Zone 1 Pipeline

Flange Connection at Zone 1 Pipeline

Flange Connection at Zone 1 Pipeline

(OP)
Dear Expert,

I'm a pipeline engineer looking for advise from you guys.

Our company is planning to do a flange tie-in at the middle of a 200km pipeline, due to government requirement in one of the country in south east asia. We won the 200km pipeline but we had to surrender half of the portion to the local company in order for us to operate in that particular area.

However, client rejected our proposal to add tie-in flange connection at the middle of pipeline as it is only allowed for spool. I wonder, is there any requirement stated in DNV or any design code that allow flange tie-in at Zone 1 pipeline? FYI, the tie-in location is at 45m water depth and for us to perform AWTI is quite difficult with current barge specification and 14inch pipe with 72mm CWC.

Appreciate your advice on this.



rgds

RE: Flange Connection at Zone 1 Pipeline

No code prohibits it.


RE: Flange Connection at Zone 1 Pipeline

I did so many sectional pipeline replacements with lot of flanges and mechanical connectors in the middle of pipeline. No issue with the Authority approval. We also have other pipeline HPHT that having U expansion spool in the middle of the pipeline.

RE: Flange Connection at Zone 1 Pipeline

Are you using ASME recommended parallel joint closure or are you welding the flanges?

Ever thought of using ASME reaction washers to make job hands free, and eliminate bolt side loading?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources