Permanent soldier pile wall with precast lagging?
Permanent soldier pile wall with precast lagging?
(OP)
Just a quick question. I have done a search on this site regarding permanent solder pile walls and precast lagging and it seams it is only done as a bottom up method which I understand why. My question is can a soldier pile wall be built top down as usual but have the timber lagging back lagged against the rear flange and then install the precast lagging bottom up backfilled with gravel and a Mira drain material?





RE: Permanent soldier pile wall with precast lagging?
I don't believe it is a very practical solution to the problem, but I also don't have extensive experience with the system.
RE: Permanent soldier pile wall with precast lagging?
www.PeirceEngineering.com
RE: Permanent soldier pile wall with precast lagging?
RE: Permanent soldier pile wall with precast lagging?
I would probably galvanize the soldier beams if using precast lagging.
www.PeirceEngineering.com