INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Brigde Crane calculation

Brigde Crane calculation

Brigde Crane calculation

(OP)
I posted this thread in the electric motor forum but got none replies so I am posting it again here. Thanks!

I need to calculate the electric motor and speed reducer for a small bridge crane. Its been very long since I have done this type of work and I not sure how to do it

Max crane load will be 2500 kg
Bridge crane weight 500 kg aprox

Number of wheels 4
Wheel diameter 132 mm

Speed 0,3 m/s

The motor and reducer will move with a chain drive a long shaft (5 meters) that connects 2 of the wheels

Any help please?

lukin1977

RE: Brigde Crane calculation

lukin1977,

This is not a clear question. What does the motor do? What allows the motor to lift stuff?

--
JHG

RE: Brigde Crane calculation

He's clearly talking about the motor that drives the crane bridge along the runway. There is a separate motor for lifting.

I think basically you have to decide how big a piece of dirt the wheels have to ride over.
... or just look in anyone's catalog and use that number.

Mike Halloran
Pembroke Pines, FL, USA

RE: Brigde Crane calculation

(OP)
The motor is for driving the crane on the railway.

Mike: I dont understand your comment about the piece of dirt. Could you explain?

RE: Brigde Crane calculation

(OP)
Occupant: Why didn´t you add the crane´s weight to the load?

Load = 2500+500 = 3000 kgf = 29419,95 N
wheel rpm = v/r = 0,3x2/0,132 = 4,54 rad/s = 43,14 rpm

i= motor rpm/wheel rpm = 1745/43.14 = 40,2

Friction force = Load x Us
Torque = Friction force x wheel diam /2 = Load x Us x wheel diam/ 2 Us = static friction coeff for steel = 0,4
Torque = 29419,95 x 0,4 x 0,132/ 2= 776,68 N.m

motor torque = 776,68 / 40,2 = 19,32 N.m

motor Power = 19,32 x 1745 x 0,1047 = 3529,89 W

3,5 kW seems too big to me

what am I missing?

RE: Brigde Crane calculation

(OP)
Thanks,
the two motorized wheels do not have a bearing of 50 mm. They have a keyed shaft
the remaining two wheels have a bronze bearing diameter 30 mm

RE: Brigde Crane calculation

Then the keyed shaft has bearings. I just selected 50mm bronze bushings because you didn't specify and if they are ball bearings, you'll have to adjust the coefficient of friction.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources